← ALL TEN CATEGORIES
Lighting Inverters
Egress paths and stairs, assembly and healthcare occupancies, parking structures, warehouses with high-bay LED.
| What we supply | Range | Configurations | Listings |
|---|---|---|---|
| Three-phase | 3.5 to 225 kW · 208, 480 and 600 V | Floor cabinets with separate battery cabinets; whole-building egress; output panelboards | UL 924 · NFPA 101 |
| Single-phase | 525 W to 18 kW · 120 to 480 V | Wall or floor mount; 90-minute runtime at full load; internal or separate battery cabinet | UL 924 |
| Extended runtime | 90 minutes standard · to 4 hours where the occupancy requires it | Larger battery cabinets; same inverter | UL 924 |
| Self-test and reporting | Monthly 30-second and annual 90-minute tests | Automatic, time-stamped logs; dry contacts; Ethernet for the building system | UL 924 · NFPA 101 7.9.3.1.1 |
| Emergency lighting control | Per circuit · listed load control relays at 120 and 277 V | Listed control devices so switched and normally-off fixtures come on at loss of normal power; bypass relays | UL 924 |
Manufacturers in this family
- Staco Energy
- Trystar
← PREVIOUS04
Batteries & MonitoringUL 1989 · UL 1973 · IEEE 450
UPS strings and cabinets, switchgear and station DC, generator cranking, telecom and utility plants.
NEXT →06Power Conditioning & ProtectionUL 1012 · UL 1047 · IEEE 519
Imaging and laboratory instruments, plant floors with drive-heavy loads, sites at the end of a long utility feeder, imported and test equipment, operating rooms and wet procedure locations, resistance-grounded plant and mine power systems.